Yes. Production is monthly. If you schedule 600 thousand, then 50 thousand are produced each month. If a strike consumes half a month, 25 thousand are produced. If you have a capacity of 300 thousand and schedule 600, you run at 100% Second Shift up to the moment of the strike. Strikes always occur in the last weeks of the year when you can no longer make up the time.
Is production at a steady rate throughout the year?